Cpm/pert graphically displays the scheduling of tasks required to complete a project.
a. True
b. False

Respuesta :

thebowman1234
thebowman1234 thebowman1234
  • 23-03-2018
a is the answer for this question
Answer Link

Otras preguntas

....................................................................................................
Who is George Washington​
please helppppppppppppp ASAP. please ensure to use step by step explanation. thanks.​
Interest = $45.58, time = 1 year, rate = 2.25%. Find the principal. Round to the nearest hundredth place
Give a descriptive case study of the floods of 2021 of sangli and kolhapur
hellooo merry christmas ! can someone please help mee? ik its a lot but even just a little help would be very mich appreciated :))
When a tensile specimen is stretched in the plastic region to an engineering strain of 0.2, calculate the amount of cold work percent.
Which part of the excerpt best demonstrates that the author’s purpose is to entertain children with a humorous story? "In the sea, once upon a time, O my Best B
Find the ratio of the following is175and210​
what are the two primary types of water pollution that have to do with where the pollution came from Point source and non point source Physical and liquid Grou